- Identify the risk components (Rx) which make up the risk
- Calculate the identified risk components (Rx)
- Calculate total risk (R)
- Identify the tolerable risk (RT)
-
Comparison of the risk R with the tolerable value (RT)
-
If R < RT, lightning protection is not necessary
- If R > RT, protection measure shall be adopted in order to reduce R